Cases
Project details and results are pending verification.
Server room inspection handover
- Client
- [[PH:case_client_1]]
- Industry
- [[PH:case_industry_1]]
Problem to document
Inspection records may be incomplete across shifts.
Proposed work
Agree a checklist, record sign-offs, and review corrective actions.
| Result to verify | [[PH:case_metric_1]] |
|---|
Data Center & Server Room OperationsNetwork cutover verification
- Client
- [[PH:case_client_2]]
- Industry
- [[PH:case_industry_2]]
Problem to document
Traffic on affected links may change during a cutover.
Proposed work
Capture the baseline, document rollback triggers, and compare traffic after the change.
| Result to verify | [[PH:case_metric_2]] |
|---|
Network Technical Support & CutoverFiber link acceptance
- Client
- [[PH:case_client_3]]
- Industry
- [[PH:case_industry_3]]
Problem to document
A new fiber route needs per-splice loss records.
Proposed work
Confirm assignments, inspect and splice the fibers, then test and record each splice.
| Result to verify | [[PH:case_metric_3]] |
|---|
Fiber Fusion SplicingFiber fault repair
- Client
- [[PH:case_client_4]]
- Industry
- [[PH:case_industry_4]]
Problem to document
A link shows a loss or reflection event that needs localization.
Proposed work
Test in both directions with OTDR, repair the indicated event, and retest.
| Result to verify | [[PH:case_metric_4]] |
|---|
Fiber Testing, Troubleshooting & RepairServer rack commissioning
- Client
- [[PH:case_client_5]]
- Industry
- [[PH:case_industry_5]]
Problem to document
New servers need verified power, network access, and stable operation.
Proposed work
Check rack load, label and connect equipment, then run a burn-in test.
| Result to verify | [[PH:case_metric_5]] |
|---|
Server Build, Rack & CommissioningInternal language model deployment
- Client
- [[PH:case_client_6]]
- Industry
- [[PH:case_industry_6]]
Problem to document
An internal application needs inference within its data boundary.
Proposed work
Size GPU capacity, deploy inference, and benchmark it under the target workload.
| Result to verify | [[PH:case_metric_6]] |
|---|
On-Premises LLM DeploymentEquipment maintenance planning
- Client
- [[PH:case_client_7]]
- Industry
- [[PH:case_industry_7]]
Problem to document
Assets and spare parts need a common maintenance schedule.
Proposed work
Reconcile the asset register, verify replacement parts, and schedule maintenance.
| Result to verify | [[PH:case_metric_7]] |
|---|
Equipment Maintenance & Inspection